The La Entrada Specific Plan is a 2,200 acre Master Planned Community located in Coachella, California. La Entrada is an approved Specific Plan and EIR that includes 7,800 master planned residential units in several distinct villages linked by over 550 acres of open space. Plans also include over 1.5 million square feet of retail and mixed use space, along with 175 acres of sports/entertainment uses at the planned freeway interchange located at Avenue 50 and Interstate 10. The Gateway Village is home to over 1.5 million square feet of retail and mixed use along with 175 acres of sports park and entertainment uses. The Project's freeway interchange at I-10 is expected to commence construction in late 2017 and open in early 2019.

Resolution No. 2017-16: Avenue 50 Extension Project

La Entrada Specific Plan

NameDateFile Size
Specific Plan
Section 0 - Cover And TOCMay 10, 20133.0 MiB
Section 1 - IntroductionMay 22, 20133.8 MiB
Section 2 - Plan ElementsMay 10, 201317.2 MiB
Section 3 - Design GuidelinesMay 10, 201346.7 MiB
Section 4 - Development RegulationsMay 10, 20133.4 MiB
Section 5 - Admin And ImplementationMay 10, 20135.0 MiB
Section 6 - GP ConsistencyMay 10, 2013247.7 KiB
Appendicies
Appendix A - Grading StandardMay 10, 201375.5 KiB
Appendix B - Legal DescriptionMay 10, 201331.1 KiB
Presentations
La Entrada Specific Plan Study Session PresentationJune 19, 20136.0 MiB

Draft Environmental Impact Report

NameDateFile Size
Cover and Table of Contents
0.0 - Cover - Volume I Draft EIRJuly 11, 2013153.5 KiB
0.1 - Table Of ContentsJuly 11, 2013126.0 KiB
Sections 1-3
1.0 - Executive SummaryJuly 11, 2013742.6 KiB
2.0 - IntroductionJuly 11, 201391.5 KiB
3.0 - Project DescriptionJuly 11, 201312.7 MiB
Section 4 - Existing Environmental Setting
4.00 - Existing Environmental SettingJuly 11, 2013360.7 KiB
4.01 - AestheticsJuly 11, 20132.8 MiB
4.02 - Agricultural ResourcesJuly 11, 2013564.8 KiB
4.03 - Air QualityJuly 11, 2013299.3 KiB
4.04 - Biological ResourcesJuly 11, 20131.6 MiB
4.05 - Cultural ResourcesJuly 11, 2013240.8 KiB
4.06 - Geology And SoilsJuly 11, 201317.0 MiB
4.07 - Global Climate ChangeJuly 11, 2013270.6 KiB
4.08 - Hazards And Hazardous MaterialsJuly 11, 2013120.0 KiB
4.09 - Hydrology And Water QualityJuly 11, 2013201.9 KiB
4.10 - Land Use And PlanningJuly 11, 20131.3 MiB
4.11 - Mineral ResourcesJuly 11, 201333.8 KiB
4.12 - NoiseJuly 11, 2013333.4 KiB
4.13 - Population And HousingJuly 11, 2013123.4 KiB
4.14 - Public Services And UtilitiesJuly 11, 2013786.3 KiB
4.15 - RecreationJuly 11, 20132.9 MiB
4.16 - Traffic And CirculationJuly 11, 20133.6 MiB
4.17 - Water SupplyJuly 11, 2013628.3 KiB
Sections 5-9
5.0 - AlternativesJuly 11, 20132.0 MiB
6.0 - Long-Term ImplicationsJuly 11, 201390.2 KiB
7.0 - MMRPJuly 11, 2013290.4 KiB
8.0 - PreparersJuly 11, 201325.3 KiB
9.0 - ReferencesJuly 11, 201368.1 KiB
Appendicies
Appendix A - NOC, NOP, And Comment LettersJuly 11, 201311.2 MiB
Appendix B - Visual Aesthetic Study View StimulationsJuly 11, 20132.9 MiB
Appendix C - Land Evaluation And Site Assessment WorksheetsJuly 11, 20131.3 MiB
Appendix D - Air Quality AnalysisJuly 11, 20134.3 MiB
Appendix E - Biological ResourcesJuly 11, 201347.2 MiB
Appendix F - Cultral ResourcesJuly 11, 20137.7 MiB
Appendix G - Geotechnical InvestigationJuly 11, 2013300.7 MiB
Appendix H - Hazardous WasteJuly 11, 20135.6 MiB
Appendix I - Drainage And Water QualityJuly 11, 201356.6 MiB
Appendix J - Noise Impact AnalysisJuly 11, 20133.0 MiB
Appendix K - La Entrada Wastewater StudyJuly 11, 201325.6 MiB
Appendix L - Traffic Impact AnalysisJuly 11, 20136.0 MiB
Appendix M - Water Study And MemoJuly 11, 2013125.4 MiB

Notification Documents for Draft EIR and Public Hearings

NameDateFile Size
Notification Documents for Draft EIR and Public Hearings
Aviso de Reunión Pública Preparación del Informe de Impactos MedioambientalesMay 19, 20131.3 MiB
Public Notice of Scoping SessionMay 19, 20131.2 MiB

Final Environmental Impact Report

NameDateFile Size
Final Environmental Impact Report
01. Responses To CommentsNovember 1, 201311.2 MiB
02. Letter No. 9 appendicesNovember 4, 2013173.3 MiB
03. Supplement To Responses To CommentsNovember 1, 2013172.3 KiB
04. Statement of Facts and FindingsNovember 1, 2013521.1 KiB
05. Statement of Overriding ConsiderationsNovember 1, 201392.7 KiB
06. Mitigation Monitoring Requirements and ProceduresNovember 1, 2013254.4 KiB

Planning Commission Public Hearing Materials

NameDateFile Size
Planning Commission Public Hearing Materials
01 - Staff ReportOctober 15, 20133.7 MiB
02 - Resolution 13-01October 15, 20131.0 MiB
03 - Resolution 13-02October 15, 2013484.5 KiB
04 - Amendment 88-03October 15, 2013220.3 KiB
05 - Exhibit AOctober 15, 20131.3 MiB
06 - Exhibit BOctober 15, 2013951.6 KiB